Description
LHD Train-Based Smeltery with capacity to provide raw materials for 1K SPM megabase.
Total Output:
Copper: 64,000 Plates/minute Iron: 77,000 Plates/minute (32,500 Plates/minute left over after Steel) Steel: 10,680 Plates/minute Brick: 6,480 Bricks/minute
Energy Requirements: 2.8 GW
v.2: Increased size of trains: All trains can now survive going through one behemoth biter per tick, and ore trains can survive going through two behemoth biters per tick.