For coal ore, copper ore, iron ore:
- 26 electric mining drill = 13.7/s
- 52 electric mining drill = 27.3/s
- 80 electric mining drill = 42.0/s
This is true at the beginning of the game without research "Mining productivity"
Upd: added prints based on https://factorioprints.com/view/-L93gSw0FOXf9mEDKPAW
