Each tile produces 150 reds per minute. Input requires at least red conveyor belts. This setup can handle up to 6 tiles, which produces 900 reds per minute (yellow conveyor belt). Recommended to upgrade one of two copper plates input to blue conveyor belts in order to handle 6 tiles.
6 tiles materials usage: ~4500 copper plates/min; ~1800 iron plates/min; ~1800 plastics/min;
